logo

Cement Blanket for Muddy Road Paving - Quick-Drying, Wear-Resistant Temporary & Permanent Road Solution

80㎡
MOQ
Inquire anytime
価格
Cement Blanket for Muddy Road Paving - Quick-Drying, Wear-Resistant Temporary & Permanent Road Solution
特徴 ギャラリー 製品の説明 見積依頼
特徴
仕様
材料: 繊維繊維とセメント粉末
幅: 4m
長さ: 20m~50m
ハイライト:

quick-drying cement blanket

,

wear-resistant temporary road solution

,

permanent road paving cement blanket

基本情報
起源の場所: 中国
ブランド名: JIANYI
証明: ISO9001
お支払配送条件
パッケージの詳細: 防水と防塵の外包装
受渡し時間: 5~8営業日
支払条件: T/T
供給の能力: 600t/month
製品の説明
Cement Blanket for Muddy Road Paving
Product Overview

Our Cement Blanket is a high-strength, wear-resistant paving solution designed to transform muddy, impassable roads into stable, drivable surfaces quickly. Engineered with a reinforced fiberglass base and high-density cement core, this innovative material hardens rapidly upon water application to create a rigid road surface with exceptional load-bearing capacity.

Key Performance: Supports vehicles up to 5-10 tons after full curing
Application Scenarios

This versatile road paving solution is ideal for multiple applications where stable surfaces are essential:

  • Rural muddy road improvement and maintenance
  • Construction site temporary access roads
  • Farmland and agricultural access roads
  • Emergency road construction in disaster-stricken areas

The cement blanket effectively resolves road impassability issues caused by rain, snow, or heavy usage, ensuring reliable transportation of agricultural products, construction materials, and emergency supplies. Suitable for both temporary applications and permanent road improvements with proper edge reinforcement.

Construction Process
1 Road Preparation: Clear the muddy road surface, remove stagnant water, and level the roadbed. Fill potholes with soil or gravel as needed for a stable foundation.
2 Unfolding & Paving: Roll out the cement blanket along the road direction, ensuring complete coverage of the road width. Overlap adjacent sheets by 15-20cm and secure edges with steel nails or gravel piles.
3 Hydration: Spray or pour water evenly across the blanket until fully saturated. Use sprinklers for efficient coverage on large areas.
4 Curing: Allow the road to dry for 24-36 hours. Light vehicles can pass after initial curing, with full load-bearing capacity achieved within 7 days. For permanent applications, consider adding a gravel or asphalt top layer as needed.
推薦されたプロダクト
私達と連絡を取ってください
コンタクトパーソン : Ms. Zhang
電話番号 : 86-13332517898
残りの文字数(20/3000)