Our Cement Blanket transforms from flexible fabric to durable concrete in just 24 hours. Combining geotextile technology with dry cementitious powder, it delivers structural strength 10x faster than traditional concrete—no mixing, pouring, or curing required.
✅ Extreme Installation Speed
Deploy 10x faster than poured concrete (200m²/hour)
No formwork, mixing, or skilled labor
✅ On-Demand Structural Integrity
Hardens to 15–25 MPa compressive strength in 24 hours
Achieves >85% final strength in 72 hours
✅ Unmatched Versatility
Conforms to any shape: slopes, ditches, curves
UV-resistant & fire-rated (BS 476 Class 1)
✅ Cost & Logistics Efficiency
90% lighter than concrete bags
Shelf-stable for 12+ months
Minimal equipment needed
Property | Value | Standard |
---|---|---|
Structure | 3D fabric + cement matrix | ISO 10318 |
Weight (Dry) | 12–20 kg/m² | ASTM D5261 |
Thickness (Hardened) | 5–25 mm | EN 1841 |
Compressive Strength | 15–25 MPa @ 24h | BS EN 12390-3 |
Flexural Strength | 3–6 MPa @ 28d | ASTM C293 |
Hydration Requirement | 12–16 L/m² | Manufacturer spec |
Roll Dimensions | 1.0m x 10m (Standard) | Custom widths available |
Temperature Range | -30°C to +65°C (post-cure) | EN 13687-1 |